#################################################### # Gene E. Ice # requesting 6 days, at minimum=4 days # beamline 34ID-E, Nanoprobe beam development and first experiments # instrument 34ID-E microbeam #################################################### # top:/home/www/beamtime-requests/req00796.txt # UNICAT Member Beam Time Request #796 # created Wed Apr 20 09:20:54 CDT 2005 #################################################### apsrun: 2005-02 beamline: 34ID-E collaboration: No collaborator_Paul: ON collaborator_Wenjun: ON contact: IceGE@ornl.gov days: 6 description: We will begin first tests of nanoprobe spectroscopy and diffraction from small precipitates ranging in size from microns to tens of nanometers. equipment_required: Second CCD experiment: Nanoprobe beam development and first experiments foreign_nationals: hazards: None instrument: 34ID-E microbeam instrument_other: minimumdays: 4 name: Gene E. Ice nonmembers: unacceptable_dates: May 11-16 May 19-29 June 10-19 June 26-28 July 17-20 July 29- August 6 August 17-31 z34ID_change_undulator: yes z34ID_details: We can use ~2 days to set up the instrument and then will need 2-3 days to run some actual experiments. z34ID_on_axis: yes z34ID_parasitic: yes z34ID_taper: yes #REMOTE_HOST: icegeg4.ornl.gov #REMOTE_ADDR: 160.91.157.187 #CONTENT_LENGTH: 808 #HTTP_REFERER: http://www.uni.aps.anl.gov/unireq.htm #HTTP_USER_AGENT: Mozilla/5.0 (Macintosh; U; PPC Mac OS X Mach-O; rv:1.7.3) Gecko/20040913 Firefox/0.10