#################################################### # Wenjun Liu # requesting 7 days, at minimum=5 days # beamline 34ID-E, Beamline realignment and new KB mirror evaluation # instrument 34ID-E microbeam #################################################### # top:/home/www/beamtime-requests/req01103.txt # UNICAT Member Beam Time Request #1103 # created Mon Dec 18 19:28:19 CST 2006 #################################################### apsrun: 2007-01 beamline: 34ID-E collaboration: No collaborator_Wenjun: ON contact: wjliu@anl.gov days: 7 description: Beamline realignment needs to be performed after relocating the microdiffraction optical table in 34-ID-E and the replacement of 34-ID commissioning window. This ensures the best on-axis measurement for 34-ID-C station and off-axis for 34-ID-E. A new KB mirror needs to be evaluated at 34-ID-E. We expect that it can improve the current microbeam focusing perfomance by factor of two and can serve the routine operation. equipment_required: experiment: Beamline realignment and new KB mirror evaluation foreign_nationals: hazards: no hazardous instrument: 34ID-E microbeam instrument_other: minimumdays: 5 name: Wenjun Liu nonmembers: submit: Submit unacceptable_dates: must be at the beginning of the run cycle. z34ID_change_undulator: yes z34ID_details: For the first two days, parasitic operations in the C station will be prevented. z34ID_on_axis: yes z34ID_parasitic: yes z34ID_taper: no #REMOTE_HOST: tea.uni.aps.anl.gov #REMOTE_ADDR: 164.54.216.198 #CONTENT_LENGTH: 1010 #HTTP_REFERER: http://www.uni.aps.anl.gov/admin/unireq.html #HTTP_USER_AGENT: Mozilla/4.0 (compatible; MSIE 7.0; Windows NT 5.1)